BookTitleMAGNET_GENERAL_CATALOG

page
177/186

This page is an overview of MAGNET_GENERAL_CATALOG on page177
Move to the page after second(s).
Now go to the page by clicking "Open the e-Book" button.

MAGNET_GENERAL_CATALOG

ReadBook

Open e-Book in Flash Viewer

This e-Book is not available in your environment.

Open e-Book in HTML5 Viewer

Summary

MAGNET_GENERAL_CATALOG

〒      ?       ?       ?       ?Section NameFaxCompanyname  AddressTelLifting Magnet Selection Data※For inquiry, please make a copy of this form.Facsimile Communication Form To Sales Dept., KANETEC Co., LtdDate of transmission   E  pagesPage■Power panelDocuments ・Attached E    sheetsE ・ none・Indoor  ・ Out door・Normal     ℁EE     phase  VAC      Hz・Provided E     E ・ Not provided・Specified (      )  ・Not specified・Run    minutes ー pause    minutes・Draining  ・Sorting  ・Scrapping  ・Others (       )・Lifting lumps  lumps   ・Lifting sheets   sheets・SS    ・ SPCC    ・ S45C    ・ FC    ・ othersE                EE       ℁EE    E   ・ ▽   ・ ▽▽or better   ・ As cast  ・Shot   ・ Plated   ・ Paint film thickness     μm・Plate    ・Pipe    ・Round bar    ・Thin sheet    ・Section steel (Attracting part to be specified)・Length Min. mm ? Max. mm・Width (Dia.) Min. mm (ρE ? Max. mm (ρE ・Thickness Min. mm ?Max. mm・Min.    kg ー Max.    kg・     tons      Lifting height      m・Electromagnet ・Permanent magnet ・Permanent electromagnet ・Battery・Chain  ・Hinge  ・Tap・Expandable ・Mobile magnet (automatic,manual) ・Fixed・Hinge type ・Trolley type・Wire ・Hinge only ・BoltingPower sourceSpecified by manufacturerUse hoursDescription of workWorkpieceMaterialTemperatureSurfaceShape DimensionMassBeam(Used/Not used)Magnet installationIf usedManualLifting methodRequired typeCranePanelSpecificationsModel Quantitiy requiredConstruction ・Indoor  ・Outdoor  ・Dustproof (air)  ・Drip-proof (air) Panel  ・Others (           )・Electrical room   ・On machine   ・Outdoor   ・On crane  ・Others (           )・SpecifiedEEW ÁED ÁEH mmE ・Not specified・Normal Max.     ℁E ?  Min.     ℁EEKANETEC standard、 Specified color E               EERequiredE          E ・Not required・Ground ・ Crane operator cab ・OthersE                EE     phase  VAC      Hz・Required (Submit specified circuit diagram) ・Not required・Required ・ Not required Guaranteed poweruninterruptible time ・5min. ・10min. ・15min. ・20min. ・30min. ・   min.Reverse excitation・Required ・ Not required method ・Manual ・Automatic・Specified E        VE ・Not specifiedOperation onpanelExternal signaloperation Specified circuit: ・Required (Submit specified circuit diagram) ・Not required (Determined by KANETEC)Specified circuit: ・Required (Submit specified circuit diagram) ・Not required (Determined by KANETEC)Required (Submit specified circuit diagram) ・Not requiredInstallation siteSizeEnvironmentaltemperaturePaint colorRemoteoperation boxOperation sitePower sourceOutput voltagevariationUninterruptiblepower supplyReverseexcitationControl circuitvoltageOperatingmethodOutput signal・Required (Select one from below) ・Not required・Operation switch ・Pushbutton switch ・Cam switch ・Controller・Cable reel ・ Cable connector  ・Others E           ECircuitspecificationsAccessoriesRemarksSuppliesModel・Required (plant,field, E  ・Not required・Available   ・Not available・Required (meeting,installation, trial run)   ・Not required・KANETEC standard,Specified color (           )・    hours / dayQuantityrequiredSampleWitnessedinspectionGuidancePaint colorOperatinghourDocumentsto submitAmbient temperatureInstallation site170