BookTitleMAGNET_GENERAL_CATALOG

page
182/186

This page is an overview of MAGNET_GENERAL_CATALOG on page182
Move to the page after second(s).
Now go to the page by clicking "Open the e-Book" button.

MAGNET_GENERAL_CATALOG

ReadBook

Open e-Book in Flash Viewer

This e-Book is not available in your environment.

Open e-Book in HTML5 Viewer

Summary

MAGNET_GENERAL_CATALOG

■Remarks・ Indoor    ・ Outdoor・ Normal    ℁E��?    ℃QuantityrequiredPaint colorOthers■Nonferrous metal separator [Nonferrous metal, aluminum can sorting, resources collection]ModelInstallation siteAmbienttemperature・ KANETEC standard, Specified color�E�           �E�Bulk specific gravityWater content・         t/m3・         wt�E�E��Substance to separateKindAmount toprocessCompositionGrain sizeCrushed sizeOthers・ Crushed  ・ Bulky  ・ Noncombustible  ・ Combustible  ・ Cans  ・ Shredded・ Rating    m3/h�E�Eax.     m3/h ? Min.     m3/h�E�     t/h   ・ Magnetic substance     �E�E��  ・ Aluminum     �E�E��  ・ Combustible     �E�E��  ・ Noncombustible     �E�E�E      mm     mesh・ Max.     mm   ・ Min.      mm・     phase     VAC     Hz・ Indoor �E�En machine, Electrical room, others �E�E・ Outdoor   ・ Normal    ?    ℁E�E Operation panel   ・ Remote�E�External signal,Others�E�QuantityrequiredControl voltageConstructionPaint colorOthers・     phase     VAC     Hz・Dustproof�E�EP-  �E��EDrip-proof�E�EP-  �E��EPanel ・Others・ KANETEC standard,  ・ Specified color �E�        �E�■Control unitModelPower sourceInstallation siteAmbienttemperatureOperatingmethod・ Yes     ・ No・ Yes     ・ No・ Yes     ・ No■Documents to be submittedPurchase specificationElectrical facility specificationPainting manual・ Yes     ・ No・ Yes     ・ No・ Yes�E�Eesignated signboard: Yes No �E��E NoEquipment general specificationInstrumentation specificationPhotographing manual■Need of submission of documentsInspection manualPainting certificate・Required      ・Not required Mill sheet ・Required      ・Not required・Required      ・Not required■Quotation■Others (Describe specifications of primary screening machine, secondary screening machine, crusher, etc.)RetentionField installation guidance・ Required     ・ Not required・ Required     ・ Not requiredWitness in factoryTrial run check and guidance・      months・ Required     ・ Not required〒      ?       ?       ?       ?Section NameFaxCompanyname  AddressTelNonferrous Metal Separator Selection Data※For inquiry, please make a copy of this form.Facsimile Communication Form To Sales Dept., KANETEC Co., LtdDate of transmission   �E�  pagesPage175